[Invite public bidding] fire control of to decoke of flue gas of aircrew of 2 ×
From;    Author:Stand originally

Fire control of to decoke of flue gas of aircrew of 2 × 300MW reachs in relief power station of big Tang Lei warm an equipment installation project

Detailed content:
Fire control of to decoke of flue gas of aircrew of 2 × 300MW reachs in relief power station of big Tang Lei warm constituent home makes public a proper motion of equipment installation project emulative invite public bidding, the bidder that welcomes to accord with a condition attends bid.
One, limits of invite public bidding
Fire control of project of to decoke of flue gas of aircrew of 2 × 300MW reachs in relief power station of big Tang Lei warm the facility that open is installed. Specific content and requirement detailed see document of invite public bidding.
2, qualificatory requirement
1, bidder must have independent corporate organization.
2, bidder has fire control and construction of Electromechanical equipment installation to always contract 2 class and above aptitude, pass safety of health of quality, environment, profession to manage systematic attestation.
3, bidder must have 1 to reach fire control of power plant of above 300MW unit to install engineering construction outstanding achievement.
4, bidder never is inside nearly 3 years in any contracts break a contact or be chased or make any contracts are removed because of the reason of oneself.
5, bidder has good bank financial condition and commercial reputation.
6, bidder plans to send this project project manager to have manager of 2 class project and above aptitude.
7, the capacity that bidder has independence to handle this project place matters concerned.
3, special requirement
1, this mark project in principle does not allow to distribute a packet, the item that needs minute of bag needs to be approved via person of invite public bidding.
2, this project does not receive an affiliation system pattern bids.
3, bidder makes sure fire control establishment is checked and accept one-time through.
4, qualificatory file requirement
Bidder must offer actual aptitude document, bid with proving to accord with eligible file is mixed have the capacity that fulfils a contract, its should include at least:
1, company business charter and intelligence letter file.
2, certificate of industry legal representative and legal representative autograph (build a rule) effective accredit book.
3, the is the same as type project valid proof material that finishs nearly 3 years.
4, the financial standing of audit of nearly 3 years of classics (financial forms for reporting statistics) .
5, the detailed list of equipment of main construction machinery that this contract that finish drafts to use.
6, the project manager that plans to send this project (original for future reference) with circumstance of personnel of main construction technology.
7, certificate of attestation of quality guarantee system.
8, safe production permits certificate.